Lake Las Vegas Waterfront – Restored Level 5 Barrel Ceiling & Archway
PROJECT DETAILS

Lake Las Vegas Waterfront – Structural Ceiling & Archway Drywall Restoration

Project Description

Settlement movement and moisture fluctuations in this luxury waterfront estate had caused severe hairline cracking and tape detachment along the grand formal gallery’s curved barrel-vaulted ceiling and arched passageways.

Our specialists engineered a surgical remediation strategy: cutting back failed drywall seams, securing loose ceiling joist connections, and infusing elastic structural bonding polymers to permanently absorb future building movement.

Our master drywall finishers then hand-contoured the sweeping barrel curve and architectural arches with customized flexible templates, finishing with a continuous Level 5 skim that eliminated all joint shadows and created a seamless, museum-quality architectural expanse.

Project Materials

Flexible Arch Beads, Structural Epoxy Binding Agent, Low-Dust Level 5 Finishing Compound
SURFACE TRANSFORMATION

Before & After Finish Comparison

AFTER AFTER
BEFORE BEFORE

⟷ Drag the slider horizontally to compare the raw substrate with the finished artisanal plaster.

PHOTOGRAPHIC DOCUMENTATION

On-Site Surface Detail Gallery

Contact Information

You can directly call us or contact through Email. We are response very Quickly

Scroll to Top